|
Staten Island light rail proposals refer to two projects in the New York City borough of Staten Island. These proposals are among the several light rail projects that have been floated in New York City in recent years.〔(【引用サイトリンク】title=Reality check for Staten Island's rail plans )〕 Neither proposal was funded in the Metropolitan Transportation Authority's 2015–2019 Capital Plan.〔 == North Shore == The North Shore Light Rail line is a proposed rail line (since turned into a bus rapid transit line) serving the northern portion of Staten Island along the abandoned right of way of the former Staten Island Railway's North Shore Branch. According to PlanNYC.org, which is affiliated with the Robert F. Wagner Graduate School of Public Service at New York University, "()he proposed five mile route, which would connect Arlington and the St. George Ferry Terminal, would cost $360 million, with funding coming from federal, state and local agencies. In order to move forward, the project will require a $4 million allocation from Congress for a feasibility study which is currently awaiting approval from the House Transportation Committee.〔(【引用サイトリンク】 url=http://www.plannyc.org/project-77-Staten-Island-North-Shore-Light-Rail )〕 A projection of 11,000–15,000 daily passengers would ride on the North Shore Light Rail if and when it is complete. This line would serve the North Shore, and would be connected with new developments such as the New York Wheel.〔(【引用サイトリンク】title=Frustrations, and desperate demands for more public transportation $$ on Staten Island as MTA shapes capital plan )〕 An option that is seriously being considered is light rail transit, due to its ability to operate with cars in mixed traffic. There is a plan to run the line down South Avenue from the Arlington station to the Teleport. The line would rise to street level at Arlington. Due to freight trains laying up as far west as Union Avenue, the line would have to be physically separate from the freight line or the cars would have to be built to a higher crash standard. Comments included begin raising the line at Union Avenue, since it would have to go to street level anyway, to avoid interference with the freight line. Some advocates of improved mass transit on the island oppose the plan, however, preferring instead the option of through service between Arlington and Tottenville via the existing Staten Island Railway, this made possible by the installation of the Ball Park loop in 2001 (since discontinued but still intact). A 2012 alternatives analysis identified bus rapid transit (Select Bus Service) rather than light rail as the preferred alternative for the region. The bus service was eventually selected.〔 About $356 million is needed to complete the line, which will run on the North Shore Branch right-of-way, adjacent to the Kill van Kull.〔 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Staten Island light rail」の詳細全文を読む スポンサード リンク
|